CARBOTURA 01 / 07
For Feedstock Providers

You are holding amanufacturing input.

Carbotura takes transfer of the materials your community or facility currently pays to remove, and converts them into critical materials through Advanced Circular Manufacturing. You pay a Beneficiation Fee (TMC Fee, "Total Material Conversion Fee") on delivered mass and receive a Circular Royalty™ on that same mass — two independent transactions under one agreement.

Term

30 years. One agreement structure. No election to make and nothing to reopen later.

Your Capital

None. No contribution to facility cost, no debt, no guarantee, no appropriation.

Your Operating Role

None. Carbotura owns, funds, deploys, and operates. You deliver material.

CARBOTURA 02 / 07
01 — The Position

Your materials are an expense line.
They were always an input.

Waste-classified materials are the only industrial stream a public authority pays to surrender. The contract renews, the rate escalates, the liability stays local, and the value leaves with the truck.

Cost

Removal contracts escalate on renewal. Nothing in that structure returns value to the authority that generated the material.

Liability

Closure obligations, long-term monitoring, and legacy mass stay with you long after the material is gone.

Leverage

Regional capacity closes faster than it is replaced. Each renewal is negotiated from a weaker position than the last.

CARBOTURA 03 / 07
02 — What Happens To It

Four protocols.
One closed manufacturing loop.

Manufacturing FeedstockContracted intake
→
Pregenesis™Prepare
→
Regenesis™Primary elemental dissociation — houses the Recyclotron™ reactor
→
Regenesis MAX™Separation and refinement
→
Circular MaterialsSynthetic graphite, graphene compounds, recovered minerals

Near-Zero Residual

Feedstock is converted to manufactured outputs — roughly 90% sold, 10% used internally to run the facility.

Near-Zero Emissions

No combustion, no stacks. This is not waste-to-energy: Carbotura sells no power, no electricity, no hydrogen.

Island Mode

The facility runs off-grid on its own process output and is a net producer of ultrapure water.

CARBOTURA 04 / 07
03 — The Agreement

One structure.
Nothing to choose between.

A single Circular Supply Agreement (CSA) governs the relationship. There is no election, no variant, and no path you can pick wrongly — the same terms that govern the executed 30-year agreement govern yours.

What Flows Each Way

You payBeneficiation Fee, per ton of delivered mass, escalating 2.5% annually
You receiveCircular Royalty™, per ton, rising every year of the term
Optional add-onLegacy Remediation Royalty on qualifying legacy mass, via the Exogenesis™ path

What Anchors It

VolumeMinimum Annual Feedstock Volume (MAFV)
Take-or-PayAsymmetric — you are obligated on the MAFV regardless of delivered volume
SiteYou retain it. No conveyance, no deed, no abatement
Ownership and liability transfer at delivery. Both the material and the responsibility for it pass to Carbotura at collection or delivery. No purchase price is paid for the material — it transfers under the CSA, and the two payment flows above run independently of that transfer and of each other.
CARBOTURA 05 / 07
04 — The Economics

The gap between them
widens every year.

Beneficiation Fee, Year n = Year-1 fee × (1.025)n−1
Royalty Multiplier, Year n = 120% + (n−1) points
Circular Royalty™, Year n = Multipliern × Feen
The multiplier applies to the current-year fee, not a frozen first-year figure. It runs 120% in Year 1 to 150% in Year 31, uncapped, while the fee escalates 2.5% per year.

Why It Always Widens

The fee and the multiplier both increase every year of the term, and the royalty is their product, so the royalty grows faster than the fee in every year. The two are separate payments and are never netted; the widening is a property of the formula — not a projection, not a forecast.

What the royalty is to us. The Circular Royalty™ is Carbotura's cost of goods for the raw material, and the only cost Carbotura bears for that feedstock — no purchase price, no acquisition cost, no procurement line, no collection cost. We are a manufacturer whose entire raw-material cost is a royalty paid to the provider of that raw material.
When it starts. The royalty commences 13 months after Carbotura receives the first Beneficiation Fee payment, rolling monthly thereafter on the corresponding delivered tonnage. The formula above is stated on an accrual basis; payment runs in arrears, so a cash table for your budget is a different and equally correct view — it simply has to say which one it is.
CARBOTURA 06 / 07
05 — Who Carries What

A volume, and a counterparty
you can underwrite.

You Stand Behind

1
The MAFVYour committed annual tonnage. Volume above it is accepted and paid on the same terms.
2
Material within specificationCharacterization is agreed during the Deployment Planning Period, before any obligation attaches.
3
The Beneficiation FeePer ton on delivered mass. It is the figure your Circular Royalty™ is calculated against, which is why the two move together.

Carbotura Stands Behind

1
The facility, entirelyOwned, funded, deployed, and operated by Carbotura. No capital, debt, or guarantee from you.
2
A single accountable integratorOne Master Authorized Systems Integrator (MASI) gives Carbotura the full-line system warranty and the performance guarantees, assembled from the component and module warranties beneath it. Accountability is built up the chain, not diffused across it.
3
A royalty that cannot be renegotiated downThe multiplier sequence and escalation are contractual for the full 30 years.
CARBOTURA 07 / 07
Next Step

Four steps.
Nothing binding until the third.

Steps 1 and 2 do not bind either party before CSA execution; each is scoped so your authority can review or seek approval before the next.

STEP 01LOI or MOUNon-binding. Establishes intent, scope, and the confidentiality frame that opens diligence.
STEP 02Term SheetWhere the MAFV and the per-ton economics are set to real numbers for your stream.
STEP 03Circular Supply AgreementThe binding 30-year instrument, executed as-is.
STEP 04Deployment Planning PeriodSite work, material characterization, and the regulatory pathway — then module manufacture and integration.

What we ask for at Step 1: historical tonnage, current removal cost and contract expiry, and legacy-mass detail if remediation may be in scope. Enough to size a Term Sheet — not a procurement.